4.
Question :
(TCO 6) Failure mode and effect analysis are
used in six-sigma projects. It involves which of the following?
5.
Question :
(TCO 6) Which of the following are eligible
companies to be considered for the Baldrige award?
6.
Question :
(TCO 3) In the textbook, Toyota's Fujio Cho
identified which of the following types of waste to be eliminated?
7.
Question :
(TCO 3) An activity where the parts that go into
each unit of a product are periodically removed from inventory and
accounted for based on the number of units produced is called which
of the following?
8.
Question :
(TCO 3) Which of the following are elements
that address elimination of waste under lean production?
9.
Question :
(TCO 3) In setting up a Kanban control system,
you need to determine the number of Kanban card sets needed. If the
expected demand during lead time is 25 per hour, the safety stock is
20% of the demand during lead time, the container size is five, and the
lead time to replenish an order is 5 hours, what is the number of
Kanban card sets needed?
10.
Question :
(TCO 3) To implement lean production
schedules, a firm would do which of the following?
===================================================
GSCM 520 Week 4 Case Study Toshibas Notebook
Computer Assembly Line
FOR MORE CLASSES VISIT
www.gscm520rank.com
Task
In a three-page paper, answer the following. Pg 199
·What is the daily capacity of the assembly-line design by the
engineers?