GANGA 61st Issue | Page 5

Newsletter No. 60; IRBMS Mount Kailash range in Southern Tibet at an investment of around US$1.2 billion. The project is elevation of 5300 m.A spring called Tamchok located in a V-shaped valley 3,200 metres above sea Khambab spills from the glaciers which later gather level. volume to become the Yarlung Tsangpo, the much smaller than China s 18,000-megawatt Three Tibetan name of Brahmaputra River. In Chinese it Gorges Dam, but still equivalent to the entire is known as Yarlung Zangbo. existing hydropower-generating capacity of Tibet. The capacity is 510 megawatts, which is In January 2013, China s State Council – the There are several tributaries of Tsangpo in Tibet; country s ultimate Raka Zangbo (Raka Tsangpo), Lhasa (Kyi) and announced its new Energy Development Plan, Nyang Qu (Gyamda) are prominent north bank which included several controversial dams on tributaries where as Nyang Qu (Nyang Chu) is a Yarlung tributary on the south bank. The Raka Zangbo suspended as a result of environmental concerns (Raka Tsangpo) joins Tsangpo in the west of and public opposition. Among these were three Xigazê (Shigatse) and Nyang Qu (Gyamda) River new hydropower dams on the middle reaches of joins the river from the north at Zela (Tsela the Brahmaputra river: the 640 MW Dagu Dam Dzong). The Lhasa (Kyi) river flows past the (which lies 18 km upstream of Zangmu, the 320 Tibetan capital of Lhasa and joins the Tsangpo at MW Jiacha Dam (also on the middle reaches of the Qüxü. The right bank tributary Nyang Qu (Nyang Brahmaputra downstream of Zangmu), and the Chu) meets the Tsangpo at Xigazê. Jiexu Dam (11 km upstream of Zangmu; the Zangbo decision-making that had previously body– been capacity of the Jiexu dam is, as yet, unconfirmed). The Yarlung Zangbo, was one of the last of great If they are all built, Zangmu will be the fourth in a rivers to remain undammed, but in 2010 it became row of five on the Sangri to Gyaca stretch of the history. On November 12, 2010, the Chinese river, between the Gyaca and Jiexu plants. Yan engineering Zhiyong, general manager of China Hydropower firm first time announced the completion of the Zangmu Hydropower Station. It Engineering Consulting, said in one media was the beginning of the damming of the river, interview: until then it has been kept under wraps. hydropower projects outside of Tibet will have The Zangmu hydroelectric power station is being been completed, and the industry s focus will shift built on the middle reaches of the Brahmaputra to the Jinsha, Lancang, the upper reaches of the Nu between the counties of Sangri and Gyaca with an River and the Yarlung. By about 2020 most of China s 5 Integrated River Basin Management Society