FY2013 Arlington Fire Department Annual Report FY 2013 | Page 53
Page 53
Squad 4 Annual Program Review
As part of the strategic initiatives in FY2013 directed by
the Fire Chief, an in depth analytical review of the
Squad 4 LRV (Light Response Vehicle) was
completed.
Goals were set for Engine 4 and Squad 4 which
include reviewing the workload distribution and
ensuring that Station #4's home district was not
experiencing a decrease in service level or
response times.
Program goals for Squad 4 were also detailed and
included determining if the majority of calls responded to were
EMS related, to ensure response times for EMS and Fire calls
were within performance standards, and evaluating mileage and
fuel savings.
The overall results of the study for the identified goals reflect that
Squad 4 performed within the program service area and service
response guidelines. Efficiencies were also identified and are in the
process of implementation.
Engine and Quint Utilization Brief
In FY2013 Quarter 4, a preliminary analysis was conducted
to look at how many engines and quints were dispatched
and arrived to fires requiring a full alarm assignment. The
initial considerations include the following:
The study identified the total calls for service and
average total response times for all engines and quints.
Unit utilization for all engines and quints was reviewed to see
how many of each type of vehicle was dispatched.
Based on the initial preview by Fire Operations, there was interest
in investigating additional criteria and expanding the analysis.
DUTY
/
HONOR
/
COMPASSION
53
/
EXCELLENCE
Working Together to Make Arlington Better.