合作与发展——纪念中以政府贷款合作20周年
2007 年底朱家桥污水处理厂二期工程正式破土动工。图为 2008 年 8 月施工人员正在进行二沉池底部
钢筋绑扎。
At the end of 2007, Zhujiaqiao WWTP Project (Second-Phase) started to construct. Picture above shows that
builders are binding the steel bars at the bottom of the Secondary Sedimentation Tank in August 2008.
生化反应池是厂区工程重要的污水处理构筑物之一,池壁高约 7 米。图为生化池底部正在施工。
Biochemical Reaction Tank, 7 meters deep, is one of the most important structures of the WWTP. Picture
above shows that the bottom of the Biochemical Reaction Tank is under construction.
44