Final LDC WQ Report | Page 71

( A ) ( B )
( C ) ( D )
Figure 28 . Images of the rehabilitation site at the Strathbogie Treatment gully taken during the 2019-20 wet season ( Photos : Fruition Environmental ) with A ) showing diversion banks and B ) showing drains directly above the gully headcut , and after 2020-21 wet season with C ) showing rock shutes to treat gully side wall extensions and D ) pasture ripping on the diversion banks to increase infiltrations . Source : Bartley et al . ( 2021 ).
71