Final LDC WQ Report | Seite 36

Table 4 . Summary of the treatment history and water quality outcomes measured in the LDC Project to date . The colour of the boxes indicates the degree of measured improvement at treatment site compared to control for each measure with green indicating an improvement , red indicating a decline and orange indicating no significant effect to date . * Represents early indicator , pending further data and is coloured in grey , NA = not available . Source : Bartley et al . ( 2021 ).
Site summary and description of treatment
Measured improvement at treatment site compared to control .
Strathbogie
Mt Wickham
Glen Bowen
Mt Pleasant
Havilah
Burdekin basin
Bogie
Bowen
Bowen
Bogie
Bowen
Managing organisation
NQDT ( J . Day )
NQDT ( Verterra )
NQDT ( Neilly Group )
NQDT ( Mulloon Institute )
NQDT ( Alluvium )
Gully type
Linear hillslope gullies
Scalds and major alluvial gullies
Scalds and major alluvial gullies
Linear hillslope gullies and scalds
Scalds and major alluvial gullies
Average annual long-term rainfall ( mm ) from nearest BOM site
~ 750 mm
~ 600 mm
~ 725 mm
~ 690 mm
~ 590 mm
Soil type Black Vertosol Hypernatric Brown Sodosol Brown or Yellow Sodosols
Catchment area ( ha ) above monitoring station at treatment site
Primary treatment
Grazing management in treatment paddock
Black and Brown Chromosols and Brown Sodosols .
Vertosols to south of gullies and Chromosols to north .
41 ha 14 ha 2.7 ha 259 ha 220 ha
- Five hillslope flow diversion banks with two drains - Fencing - Small rock revetment near headcut
Planned ( and unplanned ) grazing management in place -4- 5 months .
- Major earth works , soil treatment , rock chute structures - Fencing - Significant re-veg using mixed exotic species
160-180 weaners in treatment and control for 2- 3 weeks .
- Major earth works , soil treatment , rock chute structures + earth bund , water points - Fencing - Significant re-veg using mixed exotic species
Planned grazing management in place -various cattle numbers and time periods
- Landscape rehydration
- Four v-notch log rock sill structures and an earth bank to divert flows - Fencing and trough
Exclusion for limited periods and then rotational grazing .
Flow diversion and rock chutes to be installed in 2021
Combination of continuous grazing and spelling
Year control site monitoring began
2016
2018
2019
2019
2020
Year treatment was initiated
2019
Early 2019
Late 2019
Late 2019
2021
Year treatment site monitoring began
2016
Early 2019
Late 2019
Late 2019
2020
No . years treatment in place
1
2.5
1
1
0
No . years of control / treatment monitoring
4
3
1
1
1
Total cost ($) of on-ground works
~$ 44k
$ 595k
~$ 840k
$ 95k
~$ 230K
Land condition
Maintained , slight↑
Improved
Improved
Improved
NA
Vegetation ( hillslope + gully )
No significant effect
Improved
Improved
Maintained
NA
Sediment concentrations
Maintained
Improved
NA
No significant effect
NA
Sediment loads Maintained Improved NA No significant effect NA
Treatment effectiveness value ( as of 2020 / 21 )
0.5 0.91 - - -
36