Final LDC WQ Report | Page 19

ACTIVITY AREA
Landscape Remediation
BBB Grazier Support
Influencing
Other
Landholders
Works Category :
Historical erosion rates
Monitoring Frequency
Monitoring Frequency
Ongoing Monitoring
Treatment integrity
Vegetation ( cover and biomass ) - change in gully
Large Scale Gully Remediation Round 1
Air photos and outcomes of Landscape Remediation characterisation / prioritisation
Annual post wet season
Large Scale Gully Remediation Rounds 2-3
Air photos and outcomes of Landscape Remediation characterisation / prioritisation
Annual post wet season
Visual inspection Visual inspection
Small Scale Erosion Remediation
BBB Grazier Cluster Demo Sites ( case groups study , video , demonstration availability , offered DAF property analysis / GRASP ) N / A ( potential within P2R Sediment Projector Tool 2019 )
Air photos ** Air photos **
Annual if applicable / Project acquittal
Visual inspection
Annual if applicable / Project acquittal
Annual if applicable / Project acquittal
Visual inspection Visual inspection
Remaining BBB on ground contracts
N / A ( potential within P2R Sediment Projector Tool 2019 ))
Project acquittal
Visual inspection
Demo sites with " Other Landholders "
Air photos **
Annual
Visual inspection
Photo points Photo points Photo points Photo points Photo points Photo points Photo points
CSIRO ( aligned to NESP )
CSIRO ( aligned to NESP )
Drones and photo point **
Drones and photo point **
N / A
N / A
Drones and
photo point **
Vegetation ( cover , biomass and condition ) - change in catchment area Short term gully erosion rates
High level LDC Outcomes
Water quality measure ( rainfall , runoff , WQ , particle size ) / or WQ Indicator
Project impacts ( Social and Economic )
CSIRO ( aligned to NESP )
CSIRO ( aligned to NESP )
CSIRO ( aligned to NESP )
Interview / Case study
CSIRO ( aligned to NESP )
VegMachine Patchkey **
VegMachine VegMachine VegMachine VegMachine **
Repeat LiDAR
Gully Toolbox Gully Toolbox ** N / A
N / A
Gully Toolbox **
Time lapse cameras
Drone ( Monitor short term ) **
Water sampling units ( i . e . rising stage )
Grab samples ( Turbidity tubes )
Rain gauges
Rain gauges
WQ analysis
Rain gauges
**
Turbidity and flow sensors
Interview / Case study
Interview / Case study
Photo points Photo points Photo points Photo points
Rain gauges **
Interview / Case study
Interview / Case study
Rain gauges **
Baseline survey , project application and budgets , project acquittal , LDC completion survey
Interview / Case study
19