• To what extent have graziers adopted improved land management practices ?
• To what extent have major gullies been remediated ?
Within these questions , project costs and cost-effectiveness are important components of project evaluation and are therefore included in this report .
Establishing baseline conditions and comparing project results against a ‘ control ’ situation are critical requirements to support project evaluation . This is commonly referred to as the ‘ Before , After , Control , Impact ( BACI )’ approach . This approach has been adopted in the LDC Project where possible , although it has been limited to some extent in some activities by weather conditions and other factors noted in the more detailed reporting in Section 4.3 .
The following table of monitoring and evaluation approaches for each Activity Area was included in the LDC WQ MMR Strategy ; it was used as a guide in the implementation of the LDC Project ( Table 1 ). Much of this detail is more appropriate to report in site specific project reports . This report aims to summarise the key measures relevant to water quality that were reported as part of the project .
Table 1 . Recommended monitoring guide for the LDC Project , as of October 2018 . Note that the budgets are to be used as an indication only and will adjusted from further refinement as the project progresses . Note : ** denotes that this tool may not be applicable to all sites and should be assessed on a site-specific basis . P2R = Paddock to Reef Program . Source : Lewis et al . ( 2018 ).
ACTIVITY AREA |
Landscape Remediation |
BBB Grazier Support |
Influencing |
|
|
|
Other |
|
|
|
Landholders |
Works Category :
Minimum Standard for all works
Large Scale Gully Remediation Round 1
Large Scale Gully Remediation Rounds 2-3
Small Scale Erosion Remediation
BBB Grazier Cluster Demo Sites ( case groups study , video , demonstration availability , offered DAF property analysis / GRASP )
Remaining BBB on ground contracts
Demo sites with " Other Landholders "
Baseline ( before works ) |
Soil Analysis |
Completed on recommendation or advice of technical expert as part of the site selection . |
Current terrain analysis ( flow modelling and estimating erosion / soil loss ) |
LiDAR & possible outcome of Landscape Remediation characterisation / prioritisation ( Brooks et al ., in prep ) |
|
Gully Toolbox ** |
Gully Toolbox ** |
Vegetation ( cover and biomass ) in gully
Vegetation ( cover , biomass and condition ) - catchment area
CSIRO ( aligned to NESP )
Drones and photo point
Drones and photo point
Drones and photo point
Gully Toolbox **
N / A |
N / A |
Drones and |
|
|
photo point ** |
VegMachine |
VegMachine |
VegMachine |
VegMachine |
VegMachine |
Field Sheet including photos |
|
Patchkey ** |
Field Sheet including photos |
|
|
|
Field Sheet including photos
Field Sheet including photos
Patchkey ** Patchkey ** Patchkey **