Literature and relevant industry contacts were consulted , and the following list of water quality data was compiled for the BBB region . At the catchment scale , data consist of 5 sites , from 3 providers , and for the sub-catchment scale , 9 sites from 1 provider .
Table 7 : List of water quality data for BBB region . Note Burdekin Falls Dam and Burdekin EOV included for whole of catchment budget calculations .
Scale |
Site |
Years with data |
Catchment |
Burdekin Falls Dam |
6 |
|
Burdekin @ Inkerman |
25 |
|
Bowen @ Myuna |
14 |
|
Bogie |
7 |
Tributary |
Glenmore Creek |
1 |
|
Pelican Creek |
3 |
|
Rosella Creek |
2 |
|
Little Bowen River Junction |
6 |
|
Little Bowen River ( Exmoor ) |
1 |
|
Bowen River ( Dartmoor ) |
3 |
|
Exe Creek |
1 |
|
Emu Creek |
2 |
|
Broken River |
3 |
Small Catchment |
Bonnie Doon |
3 |
Three main methods were developed for interpretation , providing better data and system knowledge for model comparison and improvement .
Firstly , the catchment was delineated into a nested hierarchal framework based on key sites , considering discharge , stream gauging and water quality monitoring . This allows loads to be inferred to some areas that are not monitored using simple budget type calculations . These sites were then summarised in terms of simple hydrology metrics
Secondly average annual loads were constructed for each site , where appropriate , using the calculation as follows ,
Sites with loads Average Annual Load = Average Annual Mean Concentration * the long term discharge ( 1986-2014 ). Sites without loads Average Annual Load = Average Concentration of Event Samples * the long term discharge ( 1986-2014 ). This method was validated for accuracy against other long term water quality sites .
Finally at the key sites , events were defined , and key sources of constituents where identified . This was in turn completed for all GBRCLMP sites across the GBR allowing further characterisation of the BBB region .