Field Installation and Service Manual IMS127 | Page 3

Step 1 Organize the Installation 1.1 Remove all excess mate- rial from the in- stallation areas. Determine if any unused material can be reused, and handle it ac- cordingly. Otherwise, bring any scrap or trash to the trash location. 1.2 Blow out all Cabinet and Drawer interior and exterior surfaces. 127 27 1.3 Pull back all tooling, hoses and cords out of the installation area. There should be no distractions in the installation area other than the sawdust on the floor. ©2017 PCS Professional Cabinet Solutions. All Rights Reserved. Section 1: IMS 127 3