Field Installation and Service Manual IMS102 - Page 11

Appliance
Panel 5 / 8 ”
Appliance Panel 5 / 8 ”
* Filler 2-1 / 2 ” * Filler 2-3 / 4 ”
5.2 Once the Base Cabinet dimensions are marked accurately , choose a point in the base cabinet run where it is critical that a wall cabinet edge lines up directly above a base cabinet edge . On long or wall-to-wall runs , this point should be close to the middle .
Mark a plumb line through that point ( See Plumb Line A ) and use it as a starting point for marking the edges of the Wall Cabinets to either side of the plumb line . Label the Wall Cabinet locations as before .
Laying Out a Wall Cabinet Run and Marking Cabinet Locations
102
Wall Cabinet
Index Line
W391824 # 7
G . 39 ”
F . 5 / 8 ”
W3336 # 8
E . 33 ”
A . Plumb
Line
W3018 # 9
B . 30 ”
Start Here
W3036 # 10
C . 30 ”
W1536 # 11 D . 15 ”
* Wall Cabinet Depth 11-3 / 4 ”
Base Cabinet
Index Line
Refer Space 39 ”
B33 # 1
Oven Space 30-1 / 4 ”
B33 # 2
* Base Cabinet Depth 23-3 / 4 ”
Floor Highpoint
5.3 Once the cabinet edges are determined and the locations are marked with the appropriate cabinet , mark plumb lines at each vertical cabinet edge .
These lines do not have to be dark , but if marked accurately , they can help align cabinets while they are being installed and reduce the need of constantly checking level .
No need to mark a plumb line at the inside fi ller line , since the fi ller does not mount at the back wall . Continue this process for any adjacent walls .
Completing the Layout by Marking Cabinet Edge Locations with Plumb Lines
W391824 # 7
W3018 # 9
Wall Cabinet
Index Line
Refer Space 39 ”
W3336
18 ”
# 8
18 ”
W3036 # 10
W1536 # 11
Base Cabinet
Index Line
B33 # 1
Oven Space 30-1 / 4 ”
B33 # 2
Floor Highpoint
© 2017 PCS Professional Cabinet Solutions . All Rights Reserved . Section 1 : IMS 102 11
5.2 Once the Base Cabinet dimensions are marked accurately, choose a point in the base cabinet run where it is critical that a wall cabinet edge lines up directly above a base cabinet edge. On long or wall-to-wall runs, this point should be close to the middle. Mark a plumb line through that point (See Plumb Line A) and use it as a starting point for marking the edges of the Wall Cabinets to either side of the plumb line. Label the Wal 6&WB6F22&Vf&Rs33bR( Ф&6P6&W@FWƖPr3( Хs33`3R3>( ФV ƖP&VfW 76P3( Хv6&W@FWƖPs333`3#303"3( Ф23( ХsS3`3B^( У v6&W@FWF2N( Х7F'@W&PfV76P3N( Ф#303 s3#@3prWBv6&WB'VB&r6&WB6F0&6P6&W@FWF#22N( Фf"v@R26RFR6&WBVFvW2&RFWFW&֖VBBFR6F2&R&VBvFFR&&FR6&WB&V ƖW2BV6fW'F66&WBVFvRFW6RƖW2FBfRF&RF&'WBb&VB67W&FVǒFW6VƖv6&WG2vRFW&R&Vr7FV@B&VGV6RFRVVBb67FFǒ6V6rWfVVVBF&V"ƖRBFR6FRfW"ƖR66RFRfW"FW2BVBBFR&6v6FVRF2&6W72f"F6VBv26WFrFRWB'&r6&WBVFvR6F2vFV"ƖW0s3#@3p&6P6&W@FWƖP( Хs333`3( Хs33`3sS3`3&VfW 76P3( Хv6&W@FWƖPs33fV76P3N( Ф#303#303 f"v@*#r52&fW766&WB6WF2&vG2&W6W'fVB6V7F2