Engineering Strength Issue 02 Spring 2014 | Page 7
PROJECTS
Cass County Courthouse
The Cass County Courthouse project was complex due to the Heating Ventilation and Air
Project Information
Conditioning System in the building. The Courthouse was required to operate 24/7 through
any type of emergency event. The mechanical heating systems are 100% redundant and
LOCATION: Fargo, ND
capable of operating on fuel oil or natural gas.
YEAR COMPLETED: 2012
The HVAC System is an energy efficient system. It utilizes variable air volume and variable
SIZE: 70,256 sq ft
heating water volumes that use the least amount of energy possible as the heating cooling
loads change throughout the day and throughout the seasons.
The natural gas condensing boilers are the primary source of heat for the building and are
highly efficient; attaining up to 98% efficiency during optimal operating conditions. The
$
MECHANICAL COST: $2.6 million
TOTAL PROJECT COST: $14.2 Million
boilers attain their efficiency by bringing as much energy out of the combustion air as
possible.
In the courtroom, low ambient sound was a major concern. Terminal ventilation systems and
equipment were selected to provide quiet operation.
The Cass County Administration was also concerned about sound transmission to the
neighboring homes, so, the large cooling equipment on the roof was located to minimize the
sounds transmitted across property lines.
The Automatic Temperature Control System is State-of-the-Art. It allows the maintenance
staff to “see” what is going on inside the heating, ventilation and cooling systems and trouble
shoot any issues that may arise. The control set points are adjustable and observable at the
operator work station allowing the staff to determine the cause of potential problems and
determine potential corrective action.
Joined
New Team Members
1.28.2013
Molly Henkes • PT Administrative Assistant • Grand Forks Office
5.10.2013
Erik Aakhaus • Mechanical Engineering Intern • Fargo Office
11.4.2013
Kenneth McCleary, LE • Electrical Designer • Bismarck Office
7.8.2013
Lori Christensen, PE LEED AP • Mechanical Engineer • Alex Office
7.29.2013
Jonathan Matter • Controller • Fargo Office
8.19.2013
Michael Pickar • Electrical CADD Technician • Fargo Office
9.30.2013
51
Matthew Bye • Mechanical CADD Technician • Fargo Office
TOTAL TEAM MEMBERS
SPRING 2014 | PAGE 7