el Don V. 93 No. 8 | Page 3

SANTA ANA COLLEGE el Don/eldonnews.org • MONDAY, MARCH 28, 2016 NEWS 3 CAMPUS Re-planting Watch out for falling trees. A new irrigation system, trees and plumbing upgrades are being installed through a six-stage process that will connect to the Central Plant infrastructure project. The project involves a full renovation of the central mall. Removal of the trees will benefit the campus, officials said. Many were disease ridden, were not trimmed properly and have been structurally compromised causing them to fall with heavy winds, Santa Ana College Facilities Manager Mark Wheeler said. “If it’s going to benefit the school it’s good,” SAC student Claire Ortiz said. New trees will be planted as construction progresses and will be placed in “root boxes,” stopping them from damaging sidewalks by growing past their rooting area, Wheeler said. “We are making an all-out effort to install trees that are as big as possible and install the allowable irrigation systems at the same time,” he added. Infrastructure upgrades are paid for by funds from Measure Q with work continuing until October 2017. / EMILIO RODRIGUEZ ONLINE EXCLUSIVE Read the full-length story at eldonnews.org SEARCHING / Images of the man who left a suspicious note in a classroom Saturday afternoon were released late Monday. Flyers were posted across campus last week asking for help in identifying him. / Courtesy of SAC Campus Safety and Security Office SAFE