EARTHWOOL® GLASSWOOL INSULATION UNDERFLOOR BATTS EARTHWOOL® GLASSWOOL INSULATION UNDERFLOOR BATTS | Page 4

d) Bring banding across the lower face of the insulation, keeping banding parallel to underside of floor and fix banding with staple through the fold-down. Check fixed by giving light tug (double staple if required) e) Run banding down below compressed fold-down and apply another staple through band as a check placement f) Acceptable Installation: Square fit of batt Diag 2.2 V1 Fold down Diag 2.3 V1 g) Unacceptable Installation: Diag 2.1 V1 h) Continue banding around bottom of joist and repeat from a) i) Banding can be fixed on a continuous run perpendicular to joist, or as single joist to joist placements. STEP 4 Always make sure joins have good friction fits, with a uniform placement of insulation flush to the underside of the floor, and strapping applied flush to the underside of the insulation. Refer relevant standard for reaching tight locations. STEP 5 Once you have completed your installation, including any internal walls, fix the label of the Earthwool glasswool insulation outer wrapper – showing the product details and thermal resistance rating – where it can be easily seen from the entrance access-way for customer verification and retained for certification. It is recommended that once completed another team member checks the work to ensure it has been installed according to relevant standards.