When installing in joist width greater than 600mm wide, the edge strapping needs to be within 100mm
of the batt edge
Diag 3(c)
Example of how to place banding around cut-outs for Piping and Electrical etc
Diag 4, Area of no insulation in accordance with relevant standard
b) Staple start of band on bottom or lower point of joist below insulation
Diag 4
c) Bring band up to flush point at base of insulation and place first staple fixing, ensuring staple/s
maintain band is fixed appropriately by giving a light tug (double staple if required)