e-mosty June 2017: Osman Gazi B. US Suspension. Hålogaland B. e-mosty June 2017: Suspension Bridges | Page 31

Figure 6: Lane closure and snow clearance by GIIB traffic safety department Figure 5: Lane closure by GIIB traffic safety department 4. SOCIAL RESPONSIBILITY 5. INSPECTION AND MAINTENANCE STRATEGY OF GIIB An exhibition center comprising plans, drawings, photographs and models of the construction of Osmangazi Bridge has been established by the Concessionaire. It is the first bridge museum in Turkey with free admission from the public service area named Oksijen3 at the 3 rd km of the motorway. The majority of older long span suspension bridges are in the United States whereas the more recent ones are being constructed in the Far East and Europe. Turkey is the one of the countries where the latest and innovative long span suspension bridges are being constructed. Inspection and Maintenance (O&M) strategy of GIIB (Gebze Izmir İşletme ve Bakım) uses in-house facilities for concentrated routine inspections and outsourcing facilities in case of specialised principal inspections. The O&M activities through the regular inspections, periodic and specific maintenance will allow GIIB to have a safe and fully operational bridge and to maximise the life of the bridge elements and essential equipment. The maintenance manuals and yearly planning include instructions for inspections and keep the Osmangazi Bridge in a conditon so that it can achieve the specified design service life in an optimal manner taking into account the following:  Availability (bridge is kept open for users and traffic disruptions are minimal)  Costs (minimal operation and maintenance cost)  Safety (the Bridge shall be safe for users and O&M personnel) Figure 7: Osmangazi Bridge exhibition center at service area km:3+500 2/2017