K
Finishes
� After all finish materials are installed, conduct a five- to seven-day home test using a passive formaldehyde test kit( following all test instructions), and receive results less than 27 parts per billion.
� Conduct a test using an equivalent testing method, such as sorbent or impinger.
Either the Rater or the builder may complete the test.
K7.
VERIFICATION Documentation: The Rater will collect the following: Documentation of laboratory results
An Accountability Form attesting to the use of proper test procedures. The Rater must be satisfied that the appropriate testing measures have been met.
INTENT
To determine the level of formaldehyde in the indoor air, to protect the health and safety of occupants, and to raise the level of awareness of and develop empirical evidence for improvement goals.
DURABLE CABINETS
CRITERIA FOR QUALIFICATION Up to 2 points of credit are available for building durable cabinets with the following minimum standards:
• All casework is built with plywood, assembled with adhesives and screws.
• Doors are hardwood.
• Full extension drawer slides have ball bearings.
• Cabinet joints are dovetail, mortise and tenon, or other methods substantially beyond typical construction.
• Hinges are metal and attach to doors and face frame from two directions.
This measure applies to multifamily only.
VERIFICATION
DRAFT
Field Verification: The Rater will completed field compliance verification and take photos of cabinets and components.
INTENT Reduce waste, maintenance and long-term costs.
DRAFT GreenPoint Rated New Home Rating Manual Version 6.0, September 2013 77 © Build It Green