A Site
�
Covered parking( underground, parking garage, or under overhands / awnings / roof) roofs or exposed podium patio must have a solar reflectance greater than 0.3 or an SRI greater than 29 %. Uncolored concrete with or without any proportion of fly ash and / or slag may be assumed to have a solar reflectance of 0.3 or SRI of 29 %.
VERIFICATION
A5.
Field Verification: The Rater shall complete field verification and take representative photos of complying materials and practices.
Documentation: The documentation should include the following as appropriate:
INTENT
� A site plan with material and shading( if appropriate) � Area calculations � An Accountability Form with criteria signed by the builder, developer, or architect
To reduce the impact of residual heat build-up in developed areas( also known as the urban heat island effect). To reduce air conditioning loads, save energy, and reduce the production of ground-level smog.
CONSTRUCTION ENVIRONMENTAL QUALITY MANAGEMENT PLAN AND PRE- OCCUPANCY FLUSH-OUT
CRITERIA FOR QUALIFICATION
One point of credit is available for including a Construction Environmental Quality Management Plan in the project specifications. This plan requires all of the following to be noted:
� Protect construction materials from water damage during construction. � Cover / seal ducts and registers during construction. � Clean duct boots prior to occupancy. � For rehabilitation projects, implement a dust control plan that prevents particulates from migrating into occupied areas. � Complete applications of wet and odorous materials( such as paints, sealants, and coating) before installing absorbent materials such as carpets and fabric covered furnishings.
� Open windows and door for at least eight hours a day for a period of two weeks prior to occupancy. Finishes or materials that offgas volatile organic compounds( VOCs) must be installed before this official flush-out period begins. Use 100 % outside are during flush-out. The flush-out period does not need to occur overnight or compromise security. Do not conduct the flush-out when site work or dust compromises the intent of the flush-out.
VERIFICATION
DRAFT
Field Verification: The Rater must conduct appropriate verifications at rough and final to ensure that required practices are being implemented, such as protection of ducts and on-site stored or installed absorptive materials. The Rater shall take representative photos of required practices.
Documentation: The Rater must review the Construction Environmental Quality Management Plan provided by the builder or developer and ensure that all minimum requirements for the measure are included. Documentation may include Accountability Forms from responsible parties.
DRAFT GreenPoint Rated New Home Rating Manual 6 Version 6.0, September 2013