DRAFT GreenPoint Rated Existing Home Rating Manual version 6.0 | Seite 13

A ? Site Avoid smoking in building during construction. Pathway Interruption: The following measures will be implemented to keep construction air isolated from occupied areas: ? ? Ventilate using 100% outside air. Use positive pressure between construction areas and occupied areas to prevent contaminated air from trespassing. Housekeeping : The following measures will be taken to keep up the overall building hygiene during construction: ? Use construction practices that minimize the production of dust and other contaminants from construction activities. Use integral dust-collection systems on drywall sanders, cut-off saws, and routers. Confide dust generation activities to well-ventilated areas where cleanup can be carried out easily and contaminants will not be tracked to other areas. Use wet rags, damp mops, and vacuum cleaners with high-efficiency particulate (HEPA) filters to clean up dust generated by construction activities. Increase cleaning frequency when dust accumulation is noted. All spills and excess applications of solvent-containing products should be cleaned up using approved methods as soon as possible. Mop water spills up promptly. Containers of paints, finishes, and solvents shall be kept tightly sealed and preferably stored outside of the building when not in use. Scheduling: The following measures will be taken to ensure no materials are unnecessarily damaged and cleaning occurs during times when it is most effective: Complete applications of wet and odorous materials such as paints, sealants, and coatings before installing absorbent materials such as carpets, insulation, gypsum products, and fabric covered furnishings. Allow time in the schedule for the finishes to cure. To aid in the curing of interior finishes and other products used during construction and to remove pollutants after drywall installation is complete, provide adequate ventilation with 100% outside air and proper filtration. ? ? ? ? ? ? VERIFICATION Field Verifications: Conduct appropriate verifications at rough and final to ensure required practices are being implemented. Additional field verifications may be necessary. The Rater may take photographs of practices being implemented. Documentation: The Rater will collect a Construction Environmental Plan including all minimum requirements for the measure. Documentation may include Accountability Forms from responsible parties Note: The nature of this process-based measure requires good communication between the builder, homeowner, and Rater as well as judgment calls by the Rater that the practices are being implemented. It is expected that some of this process will be seen by the Rater, as the Rater should be verifying finish materials during this period. INTENT To reduce indoor environmental quality risks for construction workers in the short term and building occupants in the long term. To minimize construction-related contamination. GreenPoint Rated Existing Home Rating Manual Version 6.0, September 2013 © Build It Green 7