DOOR REPLACEMENT 2.20
ANY CHANGE TO THE OUTSIDE OF YOUR HOME REQUIRES BOTH NARC AND ACC APPROVAL
1. Obtain an application form from Kings Ridge Management Office (CMO) located at the
clubhouse. Submit the application form with a copy of the guideline, vendor
brochure to illustrate design(s), the product data with specifications, and any
other pertinent information. Return your completed application to the CMO.
2. Do not start construction of any improvement, alteration, or addition to any existing
structure or make any site improvements or changes prior to approval. After receiving
approval from the ACC, obtain and pay for all permits that may be required by
governmental authorities. Upon completion submit copies of all permits to the CMO
for filing with your Architectural Application.
3. Proposed work shall start within 45 days of approval by the ACC and shall be completed
within 180 days of commencement. Time extensions may be granted by the NARC upon
written request.
4. Replacement of original exterior doors is permitted. This is applicable to entrance, sliding,
and garage doors.
5. Doors to be replaced within interior courtyards and/or screened porches or screened
additions do not require an application for approval of the ACC.
6. Remove existing doors and all debris from site.
7. Replace existing doors with purpose made doors to match existing design and material:
a. Front entrance doors may be finished in a wood design in color that visually blend
with the house color scheme. See Guideline 2.9 HOUSE COLOR SCHEMES. Any
replacement front entrance doors in Whitehall must conform in color to Guideline
2.9.1.
b. Rear entrance doors refer to Guideline 2.9 HOUSE COLOR SCHEMES.
c. Sliding doors may be replaced with “French” style doors.
d. Garage door replacement: Regardless, of the existing door the homeowner may
install a door with one top row of clear glass windows, no design, and may be
interchangeable with screens. Style to be approved by the ACC. Doors with existing
glass lights may be replaced with solid paneled doors.
Page 1 of 2
Approved by the Board of Directors April 26, 2017
Effective April 26, 2017