Corrected ARC Guidelines PRINT FULL SETS - Master PDF 112 Pages - as of 9-2 | Page 17
SCREENED FRONT PORCH/ENTRY WAY 1.5
ANY CHANGE TO THE OUTSIDE OF THE HOME REQUIRES BOTH NARC AND ACC APPROVAL
This Guideline pertains to the construction of a screened addition.
1. Obtain an application form from Kings Ridge Management Office (CMO) located at the
clubhouse. Submit the application form with a copy of the guideline, the product data
with specifications, and any other pertinent information. Return your completed
application to the CMO.
2. Do not start construction of any improvement, alteration, or addition to any existing
structure or make any site improvements or changes prior to approval. After approval
by the ACC, obtain and pay for all permits that may be required by governmental
authorities. Upon completion submit copies of all permits to the CMO for filing with your
Architectural Application.
3. Proposed work shall start within 45 days of approval by the ACC and shall be completed
within 180 days of commencement. Time extensions may be granted by the NARC upon
written request.
4. Framing shall be aluminum, painted white, purpose made for use intended. Screening
shall be 18x18 or 18x14 mesh dark gray or charcoal color. 18x18 (a smaller opening) is
recommended.
5. Provide screens full height and width of area to be enclosed, no kick plate permitted. A
single door is permitted and may have one horizontal bar (optional) approximately 36
inches above floor and a kick plate not higher than 16 inches. Decorative grilles are
permitted (in lieu of bar and kick plate). Screen appliqués are also permitted. See
Guideline 1.51 for additional details.
6. The screened area shall not be utilized as a storage space.
7. Homeowner shall control the work and conduct of all contractors on the site.
8. Furnishings in a screened addition, i.e., screened porch or screened lanai, are the
responsibility of the homeowner and will not require approval as long as it does not
infringe on the rights of the neighborhood.
Page 1 of 2
Approved by the Board of Directors July 26, 2017
Effective Date July 26, 2017
Board