Corrected ARC Guidelines PRINT FULL SETS - Master PDF 112 Pages - as of 9-2 | Page 16

SCREEN/STORM DOOR TO EXISTING FRONT DOOR 1.4 ANY CHANGE TO THE OUTSIDE OF THE HOME REQUIRES BOTH NARC AND ACC APPROVAL 1. Obtain an application form from Kings Ridge Management Office (CMO) located at the clubhouse. Submit the application form with a copy of the guideline, diagrams, the product data with specifications, and any other pertinent information. Return your completed application to the CMO. 2. Do not start construction of any improvement, alteration, or addition to any existing structure or make any site improvements or changes prior to approval. After approval by the ACC, proposed work shall start within 45 days and shall be completed within 180 days of commencement. Time extensions may be granted by the NARC upon written request. 3. Combination Storm Door (self-storing door): Doorframe and door shall be aluminum or vinyl painted white or the same color as the front door. Door may have one horizontal bar (optional) approximately 36 inches above floor and a kick plate not higher than 16 inches. The (optional) storm door glass shall be clear or tinted gray. 4. Screen Doors (stand-alone) attached to porch screening/screened enclosure: Doorframe and door shall be aluminum or vinyl painted white. Screening shall be 18x18 or 18x14 mesh dark gray or charcoal color. 18x18 (a smaller opening) is recommended. 5. Side coiling, retractable type screen door without bars or kick plates may be painted white or the same color as the door. 6. Homeowner shall control the work and conduct of all contractors on the site. 7. Homeowner shall immediately remedy any damage to the site and adjacent premises caused by any contractor or worker. Failure to take such action in a timely manner will be cause for the neighborhood association to correct said damage at homeowner’s expense. 8. Neither the Kings Ridge Community Association, Inc. nor the neighborhood association shall have or shall assume any responsibility for maintenance or warranty for the door work and modifications to the existing home and site. End of Guideline 1.4 Approved by the Board of Directors April 26, 2017 Effective April 26, 2017