out intrusive work such as drilling, grinding and structural modifications – activities that would otherwise have risked contaminating production processes.
Working within this shutdown period presented its own challenges. All‘ dirty work’ had to be completed before the facility underwent a full deep clean ahead of restart. Any remaining tasks were then executed after hours and over weekends once production resumed. This phased approach demanded careful co-ordination, extended working hours and a high level of flexibility from the installation team.
From a design perspective, the solution ultimately adopted was a high-volume, full fresh air system, split into two almost identical zones serving different halves of the factory. This standardisation of equipment simplified manufacturing, reduced costs and streamlined maintenance. Each half of the facility is served by a dedicated system supplying approximately 30m ³/ s( 30 000 litres per second) of filtered air, with extraction rates slightly lower at around 28m ³/ s. The resulting net positive pressurisation – approximately 2m ³/ s per unit – helps to prevent dust ingress, a critical consideration in FMCG environments.
The system is built around large, bespoke air handling units supplied via AC Clima, which sources from the Chinese OEM Tong Fang Refine. Unlike off-the-shelf rooftop units, these systems were engineered specifically for the project, allowing the design team to tailor performance, dimensions and acoustic characteristics to the constraints of the site. The units were manufactured in modular sections to facilitate containerised shipping and ease of installation.
NOISE ATTENUATION
A key design driver was noise. With executive offices located directly near the plant area, the client required stringent acoustic performance. Approval of the project was contingent on demonstrating that the cooling system would not introduce disruptive noise or vibration. To address this, an acoustic consultant was engaged early in the process, and several design modifications were implemented.
Internally, the air handling units incorporate acoustic attenuators to limit noise transmission. Externally, the unit construction was upgraded from conventional polyurethane panels to thicker rockwool-filled panels, significantly improving sound insulation. Fan selection also played a critical role. Instead of traditional belt-driven fans, the system employs EC plug fan arrays – fan walls that combine multiple electronically commutated fans. These not only improve energy efficiency but also reduce noise levels and allow for more precise control. Despite the large volumes of air being moved, the result is a system that operates remarkably quietly.
The ventilation strategy itself is based on a‘ free cooling’ philosophy. For approximately 75 % of the year, the system operates using 100 % fresh air, relying on favourable ambient conditions to maintain acceptable indoor temperatures. Only when external temperatures rise above approximately 28 – 30 ° C does the mechanical pre-cooling system engage – at a cost.
Each air handling unit includes a cooling coil with a capacity of approximately 282.8kW. However, rather than adopting a conventional full-coil design, the engineers introduced a more sophisticated arrangement incorporating bypass dampers. In this configuration, roughly half of the incoming air passes over the cooling coil, while the remainder bypasses it. The air passing over the coil is cooled to around 13 ° C, enabling not only sensible cooling but also latent heat removal – effectively reducing humidity levels.
This mixed-air approach allows the system to achieve the desired supply temperature while using a smaller coil, reducing both capital cost and unit weight. It also enhances manufacturability and simplifies logistics, particularly given the need to transport the units in modular form. Humidity control was a particularly important consideration. While the factory itself does not generate significant latent loads internally, the ambient air can be highly humid. A standard coil operating at higher off-coil temperatures would have provided little dehumidification. By lowering the coil temperature and incorporating bypass dampers, the system is able to remove a portion of this moisture, improving overall comfort conditions without resorting to more energy-intensive solutions.
In winter, the system adopts a different strategy. Instead of introducing cold outside air, it leverages the heat already present within the facility. Warm air extracted from the heated shrink-wrap tunnels is recirculated back into the system via a series of dampers, providing a form of passive heating. This approach avoids the need for dedicated heating equipment and further reduces energy consumption.
Air distribution within the factory presented another challenge. The existing structure was not designed to support large, heavy ductwork, and the production areas were already densely packed with equipment. To address this, the project team opted for fabric ducting – often referred to as‘ air socks’ – supplied as part of the overall package by Enviroware. These lightweight ducts can be suspended with minimal structural support and are easier to install in congested spaces. They also offer the added benefit of being washable, an important consideration in hygienic manufacturing environments.
Filtration is handled through a combination of G4 and F7 filters, ensuring that the incoming air is adequately cleaned before being introduced into the production space. Standardisation was another key principle: grilles, dampers and duct sizes were kept consistent throughout the facility, simplifying both installation and future maintenance.
Control of the system is managed through a PLC-based platform, factory-programmed and integrated into the air handling units. This system provides a high level of visibility and control, including remote monitoring capabilities. Compared to more conventional HVAC control setups, the level of data available to operators is significantly enhanced, allowing for better performance optimisation and fault detection.
The decision to use a non-traditional OEM for the cooling components – rather than more widely recognised brands – was not taken lightly. However, the design team justified this choice on the basis that the cooling function is supplementary rather than primary. Since the system relies predominantly on free cooling, the mechanical cooling components are only required for a limited portion of the year. This, combined with the cost advantages offered by the selected equipment, made it a viable and ultimately successful option.
Motorised Siemens damper actuator providing automatic airflow control within the ventilation system.
INSTALLATION INGENUITY
From an installation perspective, the project demanded a high degree of ingenuity. The existing building imposed severe access
limitations, and much of the work had to be carried out at high level, above active production areas. Detailed 3D modelling using Revit allowed the team to plan routing and installation sequences with precision, reducing the risk of clashes and rework.
Perhaps the most significant factor in the project’ s success was the close collaboration between the consulting engineer and the contractor. Rather than adhering rigidly to an initial design, the team adopted an iterative approach, refining and optimising the system as new constraints and opportunities emerged.