PROJECT INCORPORATING COLD CHAIN 1 1. Evaporative condensers. 2 2. Robotic racking. The refrigeration plant is designed as a dual-stage plant, with the freezer store and the ACF on the -37.5°C (low-stage) circuit and the chiller store and airlock on the -10°C (high-stage) circuit. The installed refrigeration duty is 1 122kW on the low stage and 1 776kW on the high stage. Both the freezer and chiller stores are equipped with fully automatic robotic racking systems that require no human intervention within the stores. ABOUT THE PLANT in coefficient of performance (COP), The freezer and chiller stores are fitted The plant had to be sized for: • 150 tons per day automatic carton freezer (ACF) of 380m² • Freezer store of 2 000m² / 40 000m 3 • Chiller store of 1 000m² / 20 000m 3 resulting in an electrical consumption with an oxygen suppression system used reduction over the -40°C that this system for fire prevention. This eliminates the was originally designed to use. need for any sprinkler system within the • racking systems that require no human Kingspan QuadCore insulated panels intervention within the stores. and is the first store to be built with this Airlock store of 3 100m². The ACF is the first of its size built within the country. The carton freezer design was refined in consultation with WSP to operate at -35°C at the evaporator coils and still achieves the design’s throughput. This gives a 23% increase Both the freezer and chiller stores are equipped with fully automatic robotic The freezer and chiller stores are both close to 20m in internal height, each with facility. The facility has been built with type of panelling in the country. Dehumidification is achieved in the a total volume of 40 000m 3 and 20 000m 3 , airlock with ammonia hot gas reheat respectively. Given these dimensions, it is coils. This method was selected due to said to be one of the highest freezer and its efficiency in terms of power and also chiller stores within South Africa. its effectiveness. One low-stage and one high-stage compressor are each fitted with insulated motor bearings and oil coolers suitable for 60Hz operation in future. This will allow for improved energy efficiency. CHALLENGES Careful thought and design went into selecting the most suitable compressors for the application, as the load turndown on this facility is quite substantial. The ACF accounts for about 80% of the low- stage refrigeration load, and with this load offline, it is important to ensure the low-stage compressors do not cycle on and off continuously, as this is inefficient COLD LINK AFRICA • November/December 2018 www.coldlinkafrica.co.za 27