Bosch Holdings Enginuity December 2006 | Page 10

Zwide stormwater project Safe crossing at last Readers of the Herald newspaper in Port Elizabeth were shocked to read recently that ‘killer rains caused widespread chaos and devastation in Nelson Mandela Bay, leaving at least three people dead, 12 missing and thousands homeless.” SBA’s Port Elizabeth operation has been appointed to investigate the stormwater problems in one of the flood-damaged low-lying areas in Zwide, Nelson Mandela Bay. A stormwater master plan has been compiled with the following factors given careful consideration to meet the long term objectives of safe and effective stormwater management in Zwide: Val Kleyn (Ward 99 committee), Stephen Bell (Pick ‘n Pay), Clr Don Forbes (Ward 99), Brian Britz (Johannesburg Roads Agency), Jason Webster (SBA engineer), Bruce Herbert (Ward 99 committee) and Jeff Sithe (Pick’n Pay) look on as Clr Forbes cuts the ribbon during the official opening of the Braamfontein Spruit pedestrian bridge. Urgent relocation of approximately 540 houses below the 1:100 year flood level Abandoning existing stormwater \[[