Arlington Municipal Airport Development Plan Arlington Airport Development Plan | Page 5

  Element 3 – Facility Requirements establishes the critical aircraft and physical planning criteria based  on AC 150/5300‐13A, Airport Design, in preparation of a needs assessment for airside and landside fa‐ cilities.    A  detailed  study  of  the  airfield’s  capacity  will  also  be  undertaken  based  upon  the  projected  demand forecasts.    Element  4  –  Development  Alternatives  considers  a  variety  of  solutions  to  accommodate  airside  and  landside facility needs during the 10‐year planning period.  Airside alternatives will focus on the ability  of the airfield to provide for safe and efficient aircraft operations and to accommodate expected gen‐ eral aviation demand.  The focus of landside alternatives will center on maximizing the use of vacant  land to spur additional aviation growth while also analyzing the redevelopment of certain areas on air‐ port property to best meet future demands.    Element 5 – Environmental Overview analyzes potential environmental impacts generated by the rec‐ ommended development program for the airport.      Element 6 – Airport Plans provides a graphic and narrative description of the recommended plan for  the use, development, and operation of the airport following input from the PAC, TxDOT, FAA, City of  Arlington officials, and the general public.  A set of Airport Layout Plan (ALP) drawings will be devel‐ oped to depict existing and proposed facilities, approaches, and land use.  The drawing set will meet  FAA and TxDOT requirements used in determining grant funding eligibility.    Element 7 – Financial Program develops a detailed Capital Improvement Program (CIP) for the airport  that  includes  schedules,  costs,  and  funding  sources  for  the  recommended  development  projects.   Strategies for the management and economic enhancement of the airport are also included.      Element 8 – Deliverables include printing and delivering final documents which depict all the findings  of the study effort.  This task also includes efforts to present the study and its recommendations to ap‐ propriate  local  governmental  bodies.    The  final  document  shall  incorporate  the  elements  previously  detailed into a usable document.  The approval process will include a presentation of the Development  Plan  document  to  the  City  of  Arlington  Economic  Development  Committee  and  the  Arlington  City  Council for ultimate approval/adoption.      Exhibit A provides a graphical depiction of the elements and process involved with the study.      Introduction - 4