Architect and Builder Magazine South Africa May/June 2014 | Page 71
ADVERTISERS ON THIS PROJECT:
SECOND FLOOR PLAN
AECOM
Global provider of architectural,
design, engineering and
construction services
CKR Consulting Engineers
Consulting Electrical Engineers
Impendulo Design Architects
Architects
Ndodana Consulting Engineers
Consulting Structural
& Civil Engineers
Orion Project Managers
Project Managers
Plan IA
Interior Architects
Regent Lighting Solutions
Specialists manufacturers of
customised luminaires For Local
And International Projects
SPN Consulting Engineers
Consulting Mechanical Engineers
Indoor Environmental Quality
• Over 95% of all painted surfaces meet the
TVOC content limits. Over 95% of all adhesives
and sealants meet the TVOC content limits.
• 100% of the carpets meet TVOC emissions
limits outlined.
KPMG Phase II
Timber Materials
97% of the timber products (by cost) in
the building have been sourced from either
re-used timber, post-consumer recycled
timber or Forest Stewardship Council (FSC)
certified timber.
71