allows for limited joints and therefore the most efficient machine handling equipment movement within the DC .
The DC will be applying for an Edge certification for its commitment to incorporating green and sustainable practices . The facility will harvest all its rainwater through on-site attenuation dams as well as a one million litre storage tank . This water will feed domestic supply as well as the refrigeration system running the perishables building . Excess water from the refrigeration and crate wash facilities will be recycled for washing of the Pick n Pay truck fleet , while waste heat generated from the refrigeration plant will be harnessed to heat water for the crate wash . The solar system , installed on the Drygoods roof , is expected to be approximately 3MWp , consisting of around 5,500 PV modules and produce approximately 4,781,000kWh of electricity .
Development Manager : Fortress REIT Architect : ICM Architecture Logistics Engineer : Relog Project Manager : Brown Barrow & Altini Consulting Quantity Surveyor : Quanticost Structural & Civil Engineer : Sotiralis Consulting Engineers Electrical Engineer : MNS Consulting Engineers Mechanical Engineer : AMC Engineers Fire Engineer : Chimera Fire Protection Consultants Wet Services Engineer : Redline Consulting Engineers Health & Safety : Cairnmead Industrial Consultants Sustainable Building Consultant : Solid Green Consulting Environmental Consultant : Nali Sustainability Solutions Main Contractor : WBHO
Project Watch 15