APPLIED GEODESY - PART 1. ENGINEERING GEODESY - SUMMARIZED PRESENTATION | Page 80

4.1.7.2 . Description of activities
419
4.1.8 . Requirements for the contractor
419
4.1.8.1 . General requirements for the contractor
419
4.1.8.2 . Requirements for the implementation contractor team
420
4.1.9 . Requirements for the task performance
421
4.1.9.1 . General requirements for the performance
421
4.1.9.2 . Accuracy
422
4.1.10 . Reference systems
422
4.1.11 . Flight planning and survey
422
4.1.11.1 . Equipment and technical means
422
4.1.11.2 . Flight planning
422
4.1.11.3 . Flight calibration and control . Systematic errors
423
4.1.11.4 . Survey process
423
4.1.11.5 . Requirements for data processing and final materials
423
1 . Data processing
423
2 . Quality assurance and control ( QA / QC )
424
3 . Content and format of the final materials – numerical data
425
3.1 . LIDAR – cloud of relief points
425
3.2 . Digital height model of relief ( DTM ) of the “ bare ” earth surface
425
3.3 . Digital surface model ( DSM )
425
3.4 . Classified point cloud
426
3.5 . IN – a model of the earth surface relief
426
3.6 . River sections in the surveyed territory
426
3.7 . Digital relief model
426
3.8 . Scheme of separating data in blocks
426
4.1.11.6 . Deadline for implementation
427
4.1.11.7 . Presentation of results from the project implementation
427
4.1.11.8 . Acceptance of the project implementation and payment
428
4.1.11.10 . Work project
429
4.1.12 . Rights of use
429
4.1.13 . Premises and equipment
429
4.1.14 . Additional information
430
4.2 . LASER SCANNING IN SIMULATION OF HIGH WATER IN THE REGION
OF PLOVDIV
430
4.2.1 . Scope of the project
430
4.2.2 . Aerial laser scanning . Orthophoto . Thermal survey
431
4.2.3 . Geodetic measurements of transverse structures of the Maritsa River
431
4.2.4 . Terrain model to determine high water
431
4.2.5 . Hydrology
432
4.2.6 . High water simulation
432
4.3 . DEVELOPMENT OF A SYSTEM AND MEASURES AGAINST FLOODS
OF PARTICULAR OBJECTS SITUATED ALONG THE VALLEYS
AND TRIBUTARIES OF THE RUSENSKI LOM RIVER
433
4.3.1 . General activities and measures related to floods
433
4.3.1.1 . Data and information about the circumstances . Parameters of the runoff
and facilities
433
4.3.1.2 . Preliminary and preparatory works
434
4.3.1.3 . Model investigations
434
4.3.1.4 . Measures for improving safety in case of high water
434
4.3.1.5 . Technical and work projects for reconstruction and new flood protection
80