Protec
Take
a
Bao
Protec Take a Bao
Bao
Protec
festival
the
year
Protec deliver
deliver
full
technical
support
on
Dubai’s
deliver full
full technical
technical support
support on
on Dubai’s
Dubai’s EDM
EDM festival
festival of of
of the
the year
B B
ao ao
did
not
disappoint!
Massive
crowds
not
disappoint!
Massive
crowds
ao did
did
not
disappoint!
Massive
crowds
were
attracted
to to the
phenomenal
were
attracted
the
phenomenal
were
attracted
to
the
phenomenal
Protec
were
called
upon
Protec
were
called
upon
Protec
were
called
upon
line-up
of of
world
class
DJs.
Artistes
line-up
class
DJs.
Artistes
line-up
of world
world
class
DJs.
Artistes
by
client
Envie
Events
by their
client
Envie
Events
by their
their
client
Envie
Events included
included
the
top
2 2 DJs
DJ
Mag
top
100
the
top
2 DJs
of of the
DJ
Mag
top
100
included
the
top
DJs
of the
the
DJ
Mag
top
100
to
support
Martin
Garrix,
and
Dimitri
Vegas
Mike
to provide
full full
AV AV
support
for for
to provide
provide
full
AV
support
for Martin
Garrix,
and
Dimitri
Vegas
& & Like
Mike
Martin
Garrix,
and
Dimitri
Vegas
& Like
Like
Mike
Afrojack,
Don
Diablo,
as well
well
as heavyweights
heavyweights
Afrojack,
Don
Diablo,
well
as as
heavyweights
Afrojack,
Don
Diablo,
‘Bao:
Final
Frontier’
EDM
‘Bao:
The
Final
Frontier’
EDM as as
‘Bao:
The The
Final
Frontier’
EDM
Nervo,
R3hab
and
more.
Nervo,
R3hab
and
more.
R3hab and more.
festival
at
Racecourse,
festival
at Meydan
Meydan
Racecourse, Nervo,
festival
at Meydan
Racecourse,
Mel
Deighton,
Protec’s
project
manager,
Mel
Deighton,
Protec’s
project
manager,
Mel
Deighton,
Protec’s
project
manager,
Dubai.
Working
with
Envie
Dubai.
Working
with
Envie
faced
with
considerable
challenges
along
Dubai.
Working
with
Envie
faced
with
considerable
challenges
along
faced with considerable challenges along
previously
on
Sensation
and
the
way,
credits
his
team
on
delivering
previously
on
Sensation
and
credits
team
delivering
previously on Sensation and
the the
way, way,
credits
his his
team
on on
delivering
under
pressure.
under
pressure.
Unite
with
Tomorrowland,
under
pressure.
Unite
with
Tomorrowland,
Unite with Tomorrowland,
“Due
to to the
complexity
of of the
production
we
“Due
the
complexity
the
production
“Due
to the
complexity
of the
production
we we
Protec
were
delighted
Protec
were
delighted
to
were
on-site
11 11 days
for
set-up,
2 2 days
for
the
Protec
were
delighted
to to
were
on-site
days
for
set-up,
days
for
the
on-site 11 days for set-up, 2 days for the
continue
this partnership
and were
show
and we
were
fully
loaded
out 2 2 days
later.
continue
partnership
show
we
were
fully
loaded
days
later.
continue
this this
partnership
and and show
and a and
we
were
fully
loaded
out out
2 days
later.
It
was
challenging
build
which
required
It
was
a
challenging
build
which
required
rise
to
the
challenge
on
what,
to the
challenge
on what, It was
a challenging
build
which
required
rise rise
to the
challenge
on what,
cooperation
with
the
staging
company.
cooperation
with
staging
company.
cooperation
with
the the
staging
company.
according
to
baofestival.com,
Our
LED
and
lighting
needed
to
according
to
baofestival.com,
Our LED and lighting needed to be be rigged
rigged
according to baofestival.com,
Our
LED and lighting built
needed to
be rigged
intermittently
promised
to
be
a
‘two
day
intermittently and
and built into
into the
the structure
structure
promised
to
be
a
‘two
day
intermittently
and built into
the structure
promised to be a ‘two day
which
which took
took some
some extra
extra time
time and
and careful
careful
extravaganza
of
unrivalled
extravaganza
of
unrivalled
which
took
some
extra
time
and
careful with
planning.
Unfortunately,
we
got
extravaganza
of
unrivalled
planning. Unfortunately, we got unlucky
unlucky with
entertainment
Unfortunately, we got unlucky
with
the
entertainment and
and music,
music, ’ ’ and
and planning.
the weather
weather as as a a thunderstorm
thunderstorm hit
hit us us a a few
few
entertainment
and
music,
’
and
the
weather
as
a
thunderstorm
hit
us
a
few
days
before
show
meaning
our
timeline
was
‘a
production
of
unparalleled
days
before
show
meaning
our
timeline
was
‘a production of unparalleled days
before show
meaning
our timeline
was ample
significantly
‘a production
of unparalleled
significantly affected.
affected. Thankfully
Thankfully we
we had
had ample
show-stopping
grandeur.’
show-stopping grandeur.’
resources and
a committed
team we
to had
ensure
we
significantly
Thankfully
ample
resources affected.
and a committed
team to
ensure
we
show-stopping grandeur.’
resources
committed
team to ” ensure we Protec’s Chris McAleese operated audio at FOH
delivered and
on a time
and as promised.
delivered on time and as promised.”
Protec’s Chris McAleese operated audio at FOH
delivered on time and as promised.”
Protec’s Chris McAleese operated audio at FOH