106 2-2. Charging
A Meter control switches( �P. 142)
Multi-information display n Setting“ Charge Now” to on
� Operation on“ Closing Display” screen
1 Turn the power switch off.
The“ Closing Display” screen will be displayed on the multi-information display.( If the door is opened while waiting for charging schedule, the same screen will be displayed.)
2 Press to set“ Charge Now” to on.
Each time“ OK” is pressed,“ Charge Now” switches between on and off.
After setting operations are complete, charging starts when the AC charging connector is
connected.( �P. 92) * *: If the AC charging connector is
removed while the charging schedule is registered and“ Charge Now” is on,“ Charge Now” turns off.
If“ Charge Now” cannot be set to on even when performing the operations above, remove the
AC charging connector while the charging indicator is flashing at the normal speed and then immediately reconnect it.
If this operation is performed, the setting of charging current and charging limit will be temporarily initialized.( �P. 95)
Setting operations on multimedia
For details on how to operate the multimedia screen, refer to“ MULTIMEDIA OWNER’ S MAN- UAL”.
Setting operations related to the charging schedule are performed on the“ Charging schedule” screen.
n Displaying the“ Charging schedule” screen
1 Turn the power switch to ON.
It is not possible to control the charging schedule settings in ACC.
2 Touch on the main menu, then touch“ Charging schedule” on the sub menu.
The“ Charging schedule” screen will be displayed.