ZEMCH 2019 International Conference Proceedings April.2020 | Page 429

3.3. Operational Algorithm of EMS according to Photovoltaic Power Generation Pattern    Figure 3. Operational Algorithm of Demand Power EMS According to Photovoltaic Power Generation Pattern  According to the photovoltaic power generation pattern, the operation algorithm of EMS operates  in modes 1 to 5 when the ESS system is connected.    Mode 1 is used when the power generation of the photovoltaic system is greater than the load  usage, the battery SOC is more than 90%, and time T at that point is at maximum load or at a time after  the point when maximum load is forecasted.  Mode 2 is used when the power generation of the photovoltaic system is greater than the load  usage, the battery SOC is more than 90%, and the time T at that point is at maximum load or at time  before the point when the maximum load is forecasted.  Mode 1 is used when the power generation of the photovoltaic system is greater than the load  usage, but the battery SOC is less than 90%.  In general, Mode 4 is used when the load usage is larger than the amount of power generated by  the photovoltaic system, the battery SOC is more than 90%, and the time T at that point is at maximum  load or at a time after the point when the maximum load is forecasted.  Additionally,  when  the  load  usage  is  larger  than  the  amount  of  power  generated  by  the  photovoltaic system, the battery SOC is more than 90%, and the time T at that point is at maximum  load or at a time before the point when the maximum load is forecasted, system engages stand‐by and  jointly operates in Mode 5 when peak load arises. If system is not at peak load, it jointly operates in  Mode 6.  When the load usage is larger than the amount of power generated by the photovoltaic system,  the battery SOC is less than 90%, and the time T at that point is at maximum load or at a time after the  point when the maximum load is forecasted, Mode 7 is used at the time of light load.  If in the same situation it is not the light load time, Mode 8 is used.    When the load usage is larger  than the amount of power generated by the photovoltaic system and the battery SOC is less than 90%,  Mode 9 is used when the time T at that point is at maximum load or at a time before the point when  maximum load is forecasted. If it is not peak load, it operates in Mode 10. In other cases, it is to be  automatically suspended.            Development of ESS Management Pattern Algorithm for Energy Conservation through the Amount of Solar photovoltaic Power Generation Estimation 418