ZEMCH 2019 International Conference Proceedings April.2020 | Page 244

Accordingly, this study proposed the formation of space for school facilities in response to policy  changes, and the focus was on enabling both school users and residents to use spaces well through the  link between school facilities and localities.  3. A Case Study on the Change of School Facilities and Programs  The  foregoing  suggested  the  need  for  research  by  analyzing  the  limitations  and  problems  of  domestic  school  facilities  and  education  policies.  Specific  case  studies  are  intended  to  derive  implications for future programs and planning aspects. This study was limited to cases in which school  facilities were opened and operated through domestic and foreign combined projects. A total of 12 cases  were analyzed, with six schools in Korea (3 primary and 3 secondary) and six schools in Kwandong,  Japan (3 primary and 3 secondary).    Table 1. Case Plan & Section  Divison  1. Geumho  Elementary School  3. Jungang  Elementary School  5. Danggok Middle  School  6. Dogye Middle  School  Plan          Section          Divison  7. Shiki  Elementary School  9. Yoshikawa City  minami Elementary  School  12. Kaho City  Unoke Middle  School  11. Ichikawa  Municipal 7th  Middle School  Plan        Section          In  domestic  cases  (No.  1,3,5,6),  schools  and  complex  facilities  tend  to  be  separately  planned  as  annexes. The existing schools are undergoing a complex project to remodel annexes that are not used  because  of  a  decrease  in  the  number  of  students,  build  new  annexes  within  the  site,  and  use  the  underground space of the playground as a parking lot.  New schools can also be found to open lower floors and annexes, perhaps because it is considered  the easiest way to separate the space used by students from the space used by residents. The annex is  easy to separate by the entrances, and the movement to the playground or school facilities allows only  partial opening.Case 3, Jung‐Ang Elementary School, is actively using the schoolʹs land with residents,  using the playground as a town square, because the complex project is underway with the master plan  for the new city. This case has been covered by many prior studies and reports.    233 ZEMCH 2019 International Conference l Seoul, Korea