ZEMCH 2019 International Conference Proceedings April.2020 | Page 212

and semi‐underground space (Figure 7‐b). As you see the Figure 7‐a, the parking space is located on  the first floor of the newly created space and the open space on the second floor. Through this, residents  with  entrances  on  the  second  floor  can  freely  use  open  spaces  and  green  spaces,  and  the  linkage  between the commercial facilities located on the first floor and the parking lot can be improved. It is  beneficial to make full use of the exterior space.    Figure 7. (a) Profile Analysis for West Part of Area A; (b) Profile Analysis for East Part of Area A  (Drawings by Author)  In the east part of the site, the 1 st  floor is not used for commercial facilities so there parking space  can be set to be semi‐underground thereby making full use of the indoor to outdoor height difference  of about 500mm in the buildings there. Then the further depth needed for an underground parking  space is only 1.8m to meet the minimum parking space height of 2.2m [5] (Figure 7‐b).  Although the improvements mentioned above may not be the best way to solve the problems due  to  massive  underground  construction  being  limited  by  the  original  building’s  foundations  and  overhead slabs, in addition, the coverage of vegetation will also bring about structural and technical  problems.  So  overhead  slabs  and  semi‐underground  parking  should  be  the  new  direction  for  remodeling these old housing complexes.  5. Conclusion  Due to Chinaʹs real estate‐related restrictions, some old housing complexes cannot be redeveloped.  We  have  seen  that  the  residents  of  the  Jixiang  Housing  Complex  remodeled  their  houses  privately,  however,  the  exterior  spaces,  which  have  no  clear  management,  have  problems  such  as  parking,  garbage disposal, and exposure of commercial equipment. This is due to the external space not being  planned well when the Jixiang Housing Complex was built combined with the fact that daily life in  China has seen an abrupt change in recent years. Therefore, we propose to improve the outdoor space  by thinking three dimensionally to improve the overall dwelling environment. In our vision, the lower  floor is  used as a  parking lot and  the  floor  above is used as  both an  open space  and  a green  space,  thereby increasing the usability of the area. This method can increase the sustainability of old housing  complexes and be used as cornerstone of urban regeneration in the old town of Shenyang.  References  1. 2. 3. 4. 5.     201 Statistics Division of Fixed Assets Investment, National Bureau of Statistics. China Building Almanac. China  Statistics Press: Beijing, China, 1981‐2011.  Shenyang  Bureau  of  Planning  and  Land  Resources.  Master  Plan  of  Shenyang  City  2011‐2020.  Shenyang  Geographic Information Bureau: Shenyang, China, 2012.  Ministry of Housing and Urban‐Rural Development of the PRC. Code of Urban Residential Areas Planning  & Design. China Architecture & Building Press: Beijing, China, 2018.  Kang Xin. Study on the Elements Composing and Optimization of the External Space of Shenzhen Opening  Residential Area. Master`s Thesis, Harbin Institute of Technology, Harbin, China, 2017.  Ministry of Housing and Urban‐Rural Development of the PRC. Code for Design of Parking Garage Building.  China Architecture & Building Press: Beijing, China, 2015.    ZEMCH 2019 International Conference l Seoul, Korea