Energy efficiency upgrading stage
During this stage the selected EST (PHPP for this case) is used. Each step of the energy efficiency
upgrading stage is presented with a plan and a section where the bioclimatic features can be
represented. Moreover a graphic and a table show the building parameters.
DA simulation
First, the original plan DA is simulated in order to have a base parameter for the further simulations. The initial design is conceived to be made with traditional construction systems such as
concrete bricks, reason why the fabric U-values are deficient. (Table 1) (Figs. 13,14).
Table 1: DA building parameters.
Building
parameters
Site
DA
Londrina, Brazil
Treated floor External wall
area TFA
U-value
(m2)
(W/m2K)
54.40
2.172
Windows
(including
frames)
U-value
(W/m2K)
Roof surface
U-value
(W/m2K)
Floor slab
U-value
(W/m2K)
Average
thermal
envelope
6.38
3.81
2.548
3.088
Figure 13: DA plan, section and heat sources.
Figure 14: Monthly cooling demand (left) and annual heating demand (right).