Indicator |
Good Practice Evaluated |
Formula |
|
Material, Water and |
1. |
Correct storage of materials |
|
Energy Consumption
2.
|
Materials identified in the warehouse |
||
Index |
3.
4.
5.
|
Dissemination of monthly control of water consumption
Daily shutdown of hydraulic devices
Dissemination of monthly control of energy bill
|
Σ Consumption items completed x 1
ΣConsumption items evaluated
|
6. |
Daily power disconnection of electrical devices |
Solid Waste Index |
1. |
Segregation of aggregates in the correct location |
2. |
No mixed waste in disposal drums |
|
3. |
Conduits and material remains in correct boxes |
|
4. |
Correct waste disposal with transport, and final destination tracking and control |
|
5. |
Separation of hazardous waste and storage in confined area with protected floor |
1. |
Use of circular saw and bench with waste collection |
2. |
Wetting of areas during production activities and when |
sweeping | |
3. |
Wetting of materials when cutting with circular saw |
4. |
Use of plastic construction safety nets |
5. |
Effluent control during concreting and other production |
activities | |
1. |
Visual communication signs in good condition and correctly |
located on jobsite | |
2. |
Use and respect of construction site project |
3. |
Daily washing, sanitation and fumigation of internal areas, |
cloakroom and dining areas | |
4. |
Cleaning, organizing and sweeping of internal areas |
5. |
Tools in specific boxes |
6. |
Nuts and bolts in the boxes |