Areas, Rooms and Finishes Schedules
In the manage tab click on
project parameter. Add a
parameter called Density,
make sure it is a text
parameter and that it is set to
instance. Again I will group it
under identity data.
Start assigning a density to
each of the zones starting with
low then medium then high.
Medium.
Tel : 086 166 3362
Fax : 086 567 2315 e-mail : [email protected]
Physical Address : 5 Pont Road, Bryanston, Johannesburg
Page 15 of 33