Conceptual Massing
Go to the View Tab. Click on
Schedules and Quantities.
Select the Category of Mass
Floor. Click OK. In the
schedule fields add the
following fields; Usage, Floor
Area and Level. Click OK. We
can use the Sorting/Grouping
tab so show the schedule as
follows.
Tel : 086 166 3362
Fax : 086 567 2315 e-mail : [email protected]
Physical Address : 5 Pont Road, Bryanston, Johannesburg
Page 25 of 33