x CCP_REVIT Full Combined CCPs | Page 398

Worksets and Collaboration Repeat the process above for FIRE PROTECTION: Select all the pipes and sprinklers: Override the Projection/Surface Lines to RED. Repeat the process above for HVAC: Select all the Ducts and Duct Elements, Mechanical Equipment and Air Terminals: Override the Projection/Surface Lines to YELLOW Tel : 086 166 3362 Fax : 086 567 2315 e-mail : [email protected] Physical Address : 5 Pont Road, Bryanston, Johannesburg Page 18 of 20