Assisgnment – Site & Project Setup
3.
4.
5.
6.
7.
8.
the ground floor
should remain 0.
Relocate the project
so that the Survey
Height for ground
equals 1188m
Make sure the true
north and project
north are defined
correctly. Use the
below reference
images as a guide for
the project north
orientation.
Generate a
Toposurface from the
MCONTOUR1 and
GCONTOUR1 layers.
Check the height of
the toposurface by
placing a label
Contours on it.
Place a property line
around the 2 sites.
Site A and Site B.
Place a Property tag
on the 2 sites to
display their areas.
Specify the
coordinates for the
site by using the
information visible on
the cadastral lines.
Coordinates Defined
Tel : 086 166 3362
Fax : 086 567 2315 e-mail : [email protected]
Physical Address : 5 Pont Road, Bryanston, Johannesburg
Page 2 of 2