x CCP_REVIT Full Combined CCPs | Page 346

Stairs & Railings 4. In this mode you can change the profile of the rail or edit the path individually from the rail 5. Start to draw from the existing rail’s end point and continue perpendicular as shown. 1. The only drawback is that once you have edited the Top Rail at the bottom of the stairs, you cannot edit the top of the stairs. To work around that, draw another rail on the top landing and edit that Top rail. 6. Finish 7. Finish Tel : 086 166 3362 Fax : 086 567 2315 e-mail : [email protected] Physical Address : 5 Pont Road, Bryanston, Johannesburg Page 20 of 24