x CCP_REVIT Full Combined CCPs | Page 323

Door Schedules In an effort to expedite the addition of several parameters and the population of the information within these fields, we make use of key schedule. Tip: typical uses of a key schedule with regards to doors would be a door ironmongery schedule We create a new schedule as before, selecting doors and specifying a key schedule as opposed to building components. You then add additional parameters here as required. This generates a schedule without any populable rows. What is significant here is that a data row needs to be added for every combination required How the key schedule works, is that a combination of parameters is assigned to the key name (highlighted in green) These parameters along with the key name can now be added to the door schedule. By selecting a key name (in green), the parameters are automatically populated (in blue) These parameters can also be overwritten manually after this procedure Tel : 086 166 3362 Fax : 086 567 2315 e-mail : [email protected] Physical Address : 5 Pont Road, Bryanston, Johannesburg Page 8 of 11