x CCP_REVIT Full Combined CCPs | Page 3

Site and Project Setup Co-ordinates of points on the surveyed property Pay attention to the WCS position of the view cube. This can be upside down sometimes which means that you will have to rotate the drawing. We check that the drawing is empty of all unwanted information. Zoom to extents or double click the mouse wheel. Also go the layers that are in the DWG and switch all the layers on. Revit register that there are layers inside a DWG. These might be switched off and therefore they will not show, but once this DWG is imported into Revit these layers will take up ‘space’. This will then affect your dwg in Revit as indicated in the image. Tel : 086 166 3362 Fax : 086 567 2315 e-mail : [email protected] Physical Address : 5 Pont Road, Bryanston, Johannesburg Page 3 of 33