x CCP_REVIT Full Combined CCPs | Page 29

Site and Project Setup In the Massing & Site Tab, click on the Building Pad button. You will enter into a sketch mode. Draw a Building Pad following the foot print of your building. Building Pads will only cut into Topography that is created in the phase ‘New Construction. Draw a section through the building. Notice that the Building Pad has only cut through the New site. Tel : 086 166 3362 Fax : 086 567 2315 e-mail : [email protected] Physical Address : 5 Pont Road, Bryanston, Johannesburg Page 29 of 33