x CCP_REVIT Full Combined CCPs | Page 277

Design Options and Phasing REVIT CCP WORKSHOP 8 – ASSIGNMENT DESIGN OPTIONS & PHASING [email protected] WORKSHOP 8 – DESIGN OPTIONS AND PHASING Questions The Office ABC.rvt file comprise of a proposal of 3 building extensions. The project will take place over 3 Building Phases. Building A is a layout of the existing building. In Phase 1 – The interior layout of Building A will be demolished and a new layout will be built In Phase 2 – The link and Building B will be constructed In Phase 3 – The link and Building C will be constructed 1. Create the phases in Revit and set the model to the correct phases. 2. Demolish the interior walls in Building A and add a new interior layout for the offices. 3. Create 3 Views:  One to show Building A only, complete with Existing, demolished and New Construction  One to show Building A and Building B  One to show the completed construction of the project. Tel : 086 166 3362 Fax : 086 567 2315 e-mail : [email protected] Physical Address : 5 Pont Road, Bryanston, Johannesburg Page 1 of 2