Design Options and Phasing
REVIT CCP WORKSHOP 8 –
ASSIGNMENT DESIGN OPTIONS &
PHASING
[email protected]
WORKSHOP 8 – DESIGN OPTIONS AND PHASING
Questions
The Office ABC.rvt file comprise
of a proposal of 3 building
extensions. The project will take
place over 3 Building Phases.
Building A is a layout of the
existing building.
In Phase 1 – The interior layout
of Building A will be demolished
and a new layout will be built
In Phase 2 – The link and
Building B will be constructed
In Phase 3 – The link and
Building C will be constructed
1. Create the phases in Revit
and set the model to the
correct phases.
2. Demolish the interior
walls in Building A and
add a new interior layout
for the offices.
3. Create 3 Views:
One to show Building A
only, complete with
Existing, demolished
and New Construction
One to show Building A
and Building B
One to show the
completed
construction of the
project.
Tel : 086 166 3362
Fax : 086 567 2315 e-mail : [email protected]
Physical Address : 5 Pont Road, Bryanston, Johannesburg
Page 1 of 2