x CCP_REVIT Full Combined CCPs | Page 33

Site and Project Setup If you think that your building is still cutting too much into the topography then you can Relocate your project again. 500mm upwards. Once done select the topography again and move it down by the amount that you have relocated the project upwards (the building moves up but the earth or topography has to stay at the same place). This should rather be done before creating the second topography for Cut/Fill calculations. You might find that this has changed the contour label values and they do not match the labels or contour lines given on the DWG. To remedy this expand the ‘Model & Site’ panel and change the Start value for the ‘Additional Contours’ settings this will re- align the Topography contour lines with those of the DWG. Tel : 086 166 3362 Fax : 086 567 2315 e-mail : [email protected] Physical Address : 5 Pont Road, Bryanston, Johannesburg Page 33 of 33