x CCP_REVIT Full Combined CCPs | Page 319

Door Schedules PROJECT To start a new schedule, select schedules from the view tab, and select the appropriate category, this case, doors. TIP: a quicker way to start a schedule to right click on schedules in the project browser (see right) The schedule properties dialogue comprises 4 tabs, namely Fields (where we select the fields and the values we wish to display in the schedule), Filter (where we specify how or what we want to display or omit from display),/grouping (where we decide what order the information will be sorted), formatting (units, orientation, whether the field will be hidden or not) and lastly Appearance (how the schedule will look on a sheet) The fields tab is divided into two sections: left indicates all the available fields and right indicates those we have chosen. Selecting from the table on the left and Add moves the parameter to the right. Remove will remove the field from the right (the schedule) Select all the required parameters and needing a schedule and select okay to generate the schedule. Tip: special care should be taken when selecting the order in which the parameters appear. The sooner this is finalised, the Tel : 086 166 3362 Fax : 086 567 2315 e-mail : [email protected] Physical Address : 5 Pont Road, Bryanston, Johannesburg Page 4 of 11