WFP Regional Bureau for Asia and the Pacific - 2016 SPRs RBB 2016 SPRs by project type | Page 693

Standard Project Report 2016 Output Unit Planned % Actual vs. Actual Planned SO1: Food-Assistance-for-Assets Hectares (ha) of agricultural land benefiting from rehabilitated irrigation schemes (including Ha 5 1 20.0% Kilometres (km) of feeder roads built and maintained Km 7 3 42.9% Kilometres (km) of mountain trails rehabilitated Km 48 44 91.7% bridge 2 2 100.0% irrigation canal repair, specific protection measures, emb