Project End
Outcome
Target
Base Value
Previous Latest
Follow-up Follow-up
NCI: Resilience programmes National Capacity Index
200319.C4 LOCATIONS, Project End Target: 2017.12, Stakeholder's workshop, Base value:
2012.12, WFP survey, Stakeholder's workshop, Previous Follow-up: 2015.12, WFP survey,
NCI Consultation Workshop
=20.00 10.00 12.00 -
=60.00 - 0.00 -
=20.00 12.00 16.00 -
Proportion of targeted communities where there is evidence of improved capacity to
manage climatic shocks and risks supported by WFP
200319.C4 LOCATIONS, Project End Target: 2017.12, Survey reports, Previous Follow-up:
2014.12, WFP programme monitoring, HH survey, Focus group discussions
NCI: Food security programmes National Capacity Index
200319.C4 LOCATIONS, Project End Target: 2017.12, Stakeholder's workshop, Base value:
2012.12, WFP survey, Stakeholder's workshop, Previous Follow-up: 2015.12, WFP survey,
NCI Consultation Workshop
SO4 Reduce undernutrition and break the intergenerational cycle of hunger
Ownership and capacity strengthened to reduce undernutrition and increase access to education at regional, national and community levels
NCI: School Feeding National Capacity Index
200319.C4 LOCATIONS, Project End Target: 2017.12, Stakeholder's workshop, Base value:
2012.12, WFP survey, Stakeholder's survey, Previous Follow-up: 2015.12, Secondary data,
SABRE Country Report (Nepal)
=20.00
8.00
12.00
-
Output Indicators
Output
Unit
Planned
% Actual vs.
Actual
Planned
Comp.1- Livelihoods and Asset Creation
SO3: Food-Assistance-for-Assets
Hectares (ha) of agricultural land benefiting from new irrigation schemes (including irrigation
Ha 226 228 100.6%
Ha 922 926 100.5%
Hectares (ha) of fruit trees planted Ha 100 100 100.0%
Kilometres (km) of feeder roads built and maintained Km 34 43 126.2%
Kilometres (km) of feeder roads rehabilitated and maintained Km 10 9 97.9%
Kilometres (km) of mountain trails constructed Km 13 14 106.3%
Kilometres (km) of mountain trails rehabilitated Km 12 12 100.8%
centre/site 3 3 100.0%
bridge 3 3 100.0%
asset 5 5 100.0%
project 8 8 100.0%
water pond 1 1 100.0%
canal construction, specific protection measures, embankments, etc)
Hectares (ha) of agricultural land benefiting from rehabilitated irrigation schemes (including
irrigation canal repair, specific protection measures, embankments, etc)
Number of Community Agriculture Extension Center rehabilitated / constructed
Number of bridges constructed
Number of buildings rehabilitated / constructed (School Building, Facility Center, Community
Building)
Number of drinking water/water harvest projects
Number of farm ponds constructed for micro irrigation and lined (120 cbmt)
Nepal, State of (NP)
39