WFP Regional Bureau for Asia and the Pacific - 2016 SPRs RBB 2016 SPRs by project type | Page 205

Standard Project Report 2016 Project End Outcome Target Base Value Previous Latest Follow-up Follow-up NCI: Resilience programmes National Capacity Index 200319.C4 LOCATIONS, Project End Target: 2017.12, Stakeholder's workshop, Base value: 2012.12, WFP survey, Stakeholder's workshop, Previous Follow-up: 2015.12, WFP survey, NCI Consultation Workshop =20.00 10.00 12.00 - =60.00 - 0.00 - =20.00 12.00 16.00 - Proportion of targeted communities where there is evidence of improved capacity to manage climatic shocks and risks supported by WFP 200319.C4 LOCATIONS, Project End Target: 2017.12, Survey reports, Previous Follow-up: 2014.12, WFP programme monitoring, HH survey, Focus group discussions NCI: Food security programmes National Capacity Index 200319.C4 LOCATIONS, Project End Target: 2017.12, Stakeholder's workshop, Base value: 2012.12, WFP survey, Stakeholder's workshop, Previous Follow-up: 2015.12, WFP survey, NCI Consultation Workshop SO4 Reduce undernutrition and break the intergenerational cycle of hunger Ownership and capacity strengthened to reduce undernutrition and increase access to education at regional, national and community levels NCI: School Feeding National Capacity Index 200319.C4 LOCATIONS, Project End Target: 2017.12, Stakeholder's workshop, Base value: 2012.12, WFP survey, Stakeholder's survey, Previous Follow-up: 2015.12, Secondary data, SABRE Country Report (Nepal) =20.00 8.00 12.00 - Output Indicators Output Unit Planned % Actual vs. Actual Planned Comp.1- Livelihoods and Asset Creation SO3: Food-Assistance-for-Assets Hectares (ha) of agricultural land benefiting from new irrigation schemes (including irrigation Ha 226 228 100.6% Ha 922 926 100.5% Hectares (ha) of fruit trees planted Ha 100 100 100.0% Kilometres (km) of feeder roads built and maintained Km 34 43 126.2% Kilometres (km) of feeder roads rehabilitated and maintained Km 10 9 97.9% Kilometres (km) of mountain trails constructed Km 13 14 106.3% Kilometres (km) of mountain trails rehabilitated Km 12 12 100.8% centre/site 3 3 100.0% bridge 3 3 100.0% asset 5 5 100.0% project 8 8 100.0% water pond 1 1 100.0% canal construction, specific protection measures, embankments, etc) Hectares (ha) of agricultural land benefiting from rehabilitated irrigation schemes (including irrigation canal repair, specific protection measures, embankments, etc) Number of Community Agriculture Extension Center rehabilitated / constructed Number of bridges constructed Number of buildings rehabilitated / constructed (School Building, Facility Center, Community Building) Number of drinking water/water harvest projects Number of farm ponds constructed for micro irrigation and lined (120 cbmt) Nepal, State of (NP) 39 Country Programme - 200319