Standard Project Report 2016
(NROC) and the recently opened Visayas Disaster Response Centre (VDRC), and eventually the transfer of the
mechanized packing system (MPS) in VDRC to a new DRC that has yet to be determined.
In the context of delays in government land acquisition for the Visayas DRC site, WFP leased a 5,000 square meter
warehouse in Cebu, and established a temporary DRC in this location, the second of its kind in the Philippines.
MPS equipment of equal specification to that installed in the NROC facility was installed and officially launched in
April 2016. The temporary facility, which is leased for two years, accommodates decentralized emergency response
operations of DSWD and OCD in the Visayas region, and provides for production of an additional capacity of a
maximum 50,000 family packs per day, which is enough to feed 250,000 people for three days.
Based on the lessons learned from the initial setup in the NROC in Manila, some minor changes, such as bringing
the various raw-materials closer to the areas where needed, extending the loading area for the loading hopper for
the bagging machines, lowering the height of the conveyor belts and extending the distance from bagging machines
to case erectors, to name a few, were incorporated to ease the work of the workforce b